XTM App Installation Guide
XTM is a powerful cloud-based translation management platform designed to streamline language localization and content distribution across multiple systems. With its robust, user-friendly, and cost-effective features, XTM enables businesses to efficiently manage translations, ensuring consistent multilingual experiences at scale.
Through the Contentstack Marketplace, you can seamlessly integrate the XTM app into your stack to create and manage localized versions of your content with ease.
Prerequisites
- XTM Cloud account
- Contentstack account
- Access to the Contentstack Organization/Stack as the Owner/Admin
Follow this step-by-step guide to install and configure the XTM app within your stack.
Steps for Execution
- Retrieve your Credentials from XTM
- Create Workflow in Contentstack
- Install and Configure the XTM app in Marketplace
- Use the XTM App for Machine Translation
- Use the XTM app for Human Translation
Retrieve your Credentials from XTM
To configure and connect the XTM app within Contentstack, you need to fetch the credentials from your XTM account by following the given steps:
- Log in to your XTM Cloud account and copy the Base URL, Company name, and Password. During the app configuration in step 3, paste these values into the corresponding fields: XTM Base URL, User Company Name, and XTM Password.
- To get the User ID, navigate to Users > User list, select the relevant user, and click the “Info” icon. Copy the ID and paste it into the XTM User Identifier field in step 3.Click to enlarge
- To get the Customer ID, navigate to Customers > Customer list, select the relevant customer and click the “Info” icon. Copy the ID and paste it into the XTM Customer ID field in step 3.Click to enlarge
- If you want to create projects in Contentstack using the Entry Sidebar or Full Page app, you must create a workflow in XTM.
To do this, navigate to Configuration > Settings > Workflow. Under Workflow definitions, create a new workflow by clicking the Add button or select an existing one. Copy the Workflow definition name and paste it into the XTM Workflow field in step 3.
Click to enlarge
Note In XTM, you must define the languages and create a translation template to enable the translation process. Ensure that the languages configured in XTM also exist in your Contentstack to maintain seamless integration.
Add Custom Fields in XTM
Mapping custom fields from Contentstack into XTM adds valuable context and traceability to your localization process. For instance, adding Submitter’s Name, Contentstack Entry Link, Contentstack Stack API custom fields during app configuration in step 3.
To add custom fields in XTM, follow the given steps:
- Navigate to Configuration > Data > Custom fields. Under Project custom fields, click the Add button.Click to enlarge
- In the Add custom field modal, enter the Field name, select Field type as Text field from the dropdown, and click Save.Click to enlarge
Note Ensure that the checkbox for the Active field is selected.
Create Workflow in Contentstack
Before using the XTM app for translations, you must define a Workflow to create a project and initiate the translation process.
To create a workflow, log in to your Contentstack account, and follow the steps:
- Navigate to your stack, click Settings in the top navigation panel, and then click Workflows. Click the + New Workflow button to add a new workflow.Click to enlarge
- On the workflow creation page, enter the following details:
- Provide the Workflow Name and Description.Click to enlarge
- Set the Scope of the workflow that includes setting up the branches and content types.Click to enlarge
- Define the Workflow Stages.Click to enlarge
- Select the Workflow superuser(s) from the provided dropdown. To activate the workflow, click the Enable Workflow toggle button.Click to enlarge
- Provide the Workflow Name and Description.
- After filling up the details, click Save. A workflow is created to configure in the XTM app in step 3.
Additional Resource To learn more, refer to the Workflows documentation.
- Navigate to your stack, click Settings in the top navigation panel, and then click Workflows. Click the + New Workflow button to add a new workflow.
Install and Configure the XTM app in Marketplace
To install the app in Contentstack, log in to your Contentstack account and follow the steps below:
- Navigate to the “App Switcher” icon in the top-right corner and click Marketplace.Click to enlarge
- Click Apps from the left panel.
- Within the Marketplace, locate the XTM app and click Install.Click to enlarge
- In the pop-up window, select the stack where you want to install the XTM app, accept the Terms of Service, and click the Authorize & Install button.Click to enlarge
- On the Configuration screen, enter the following details:
- XTM Fields: Enter your XTM credentials to connect Contentstack with your XTM account.
- Provide the XTM Base URL, XTM User Identifier, User Company Name, XTM Customer ID, XTM Password, and XTM Workflow retrieved in step 1.Click to enlarge
- XTM offers two types of translation methods. Under Select Translation Type, choose one:
- Machine Translate: Machine Translation automatically translates your entry content as soon as you update the workflow, enabling faster processing and translation of data. This option is ideal for quick turnarounds or when human review is not required.
Machine Translate is, by default, selected.
Additional Resource Refer to the Use the XTM App for Machine Translation section for further steps.
- Human Translate: Human Translation allows translators on the XTM side to manually translate the content. While this method takes longer than machine translation, it provides greater accuracy and quality control.
Additional Resource Refer to the Use the XTM App for Human Translation section for further steps.
- Machine Translate: Machine Translation automatically translates your entry content as soon as you update the workflow, enabling faster processing and translation of data. This option is ideal for quick turnarounds or when human review is not required.
- XTM Templates help you define the languages into which you want to translate your content. Click the Get XTM Template button; a dropdown menu appears with a list of available templates from XTM. Select the appropriate template that matches your localization needs.Click to enlarge
- By selecting the XTM Custom Fields (Submitter’s Name, Contentstack Entry Link, or Contentstack Stack API), you can map additional metadata from Contentstack to XTM. These fields are sent to XTM when creating a translation project.Click to enlarge
Note
- The fields contentstack_initiator_name, contentstack_entry_link, and contentstack_stack_api must exist in the Custom fields section of the XTM app. For more details, refer to the Add Custom Fields in XTM section.
- If you select Submitter’s Name, it will appear in the Status section of the Contentstack Entry Sidebar.
- Enable the Auto Assign Template toggle button to select a translation template when initiating translations from the Entry Sidebar.Click to enlarge
- Provide the XTM Base URL, XTM User Identifier, User Company Name, XTM Customer ID, XTM Password, and XTM Workflow retrieved in step 1.
- Click the Next button.
- Contentstack Fields: Configure workflows, stages, and roles for project creation and translation within Contentstack.
- You can create a project using multiple workflows within Contentstack to define how content moves through the translation process. Mark the Workflow checkbox and then click the Add Workflow button.Click to enlarge
- Select the Workflow from the dropdown and then fill up the four workflow stages: Request Stage, Completed Stage, In Progress Stage (optional), and Error Stage (optional) from the respective dropdowns.
- Select an XTM Templates to create projects associated with the chosen workflow.
- Enable the Enable Workflow for Sidebar or Bulk Translate toggle button to apply your workflow configurations when sending entries for translation via the Sidebar or Bulk Translate.Click to enlarge
Note To use the Enable Workflow for Sidebar or Bulk Translate setting, make sure your XTM app is updated to the latest version.
- To create a project using the Entry Sidebar or Bulk Translate in the Full Page app, check the From Sidebar or Bulk Translate in the Full Page UI checkbox, and select a role from the Select Roles dropdown.
- To create a project using the Content Types Bulk Translate in the Full Page app, check the Content Types Bulk Translate in the Full Page UI checkbox, and select a role from the Select Roles dropdown.Click to enlarge
Note Only users with the selected roles will have access to Create Project from the Full Page Location and Entry Sidebar. By default, only the Stack Owner and Admin have this permission.
- Version Naming: You can append the master locale to the version name, making it easier to identify and track different versions across locales.
Syntax: sourceEntrylocale_sourceEntryversion_targetEntryVersion
For example: en-us_1_3
- Character Limit Validation: Translators can now view both maximum and minimum character limits directly within the XTM dashboard.Click to enlarge
- To publish an entry automatically to the specified environments after the translation, mark the Publish Entry checkbox and select the required environment(s) and the content type(s) to which you want to publish.
- If you select the Enable Additional Settings option, you can define the scope of your fields for translation.Click to enlarge
- You can create a project using multiple workflows within Contentstack to define how content moves through the translation process. Mark the Workflow checkbox and then click the Add Workflow button.
- Click the Next button.
- Additional Settings: You can include or exclude specific fields from translation for specific content types, or apply global exclusions across all content types.
- Field(s) to Exclude from All Content Types: Define fields that should be excluded from translation across all content types. For example, excluding title and url ensures these fields are never translated in any content type.
- Select Field Types to Exclude: Automatically exclude fields based on their field type. For example, selecting Number will filter out and exclude all number-type fields across content types from translation.Click to enlarge
Note
- When the target language is not localized, the XTM app uses the source language code for exclusions.
- When the target language is localized, it uses the target language code for exclusions.
- Manage Fields: Click the Manage Fields button to open the Content Type Settings modal.Click to enlarge
In the Content Type Settings modal, use the dropdown to search and select a content type, then choose the field UIDs you want to include or exclude for translation.
Note The XTM app now supports up to 6 levels of nesting.
Once done, click the Save button to apply your selections.
Click to enlarge - Language Configuration: Define the content translation languages for XTM and Contentstack to avoid any mismatch between the language codes.
Click the Add Language button to add a language. All entries from XTM languages will be localized into the corresponding Contentstack languages.
For any target languages not selected, the app uses the default language code of the stack.
Exclude Languages: Select the language(s) from the dropdown that you want to remove from the Language dropdown in the sidebar.
Click to enlarge - Set Up Trigger URL: Configure your endpoint to receive automatic triggers from XTM. A POST request is sent when a project is created, and a GET request is made when the project is completed.Click to enlarge
- Once done, click Finish.
- If you want to reset the configuration settings, click the Reset Configuration button. A popup will appear. Click the Reset Config button to reset the entire configuration.Click to enlarge
Note For existing users, to use the Branches support for content translation, update the app.
- XTM Fields: Enter your XTM credentials to connect Contentstack with your XTM account.
- After adding the configuration details, click the Save button.
- On the UI Locations tab, you can see the predefined app locations. You can use the toggle button corresponding to each UI location to enable or disable it based on your requirements.Click to enlarge
- If the webhook is enabled for your app, you can view the webhook logs under the Webhook tab.
Additional Resource For more information on UI locations and webhooks, refer to the Installed Apps guide.
- Navigate to the “App Switcher” icon in the top-right corner and click Marketplace.
Use the XTM App for Machine Translation
To create projects for translation using the XTM app, you can use Workflow, Entry Sidebar, and Full Page Location.
Using XTM in a Workflow
To use XTM in a workflow, log in to your Contentstack account and follow the steps given below:
Note We assume that you have created a workflow in step 2 and then configured the workflow and workflow stages under Contentstack Fields in the XTM app configuration in step 3.
- Navigate to Entries from the header and open the entry you want to translate. Then click the “Workflow Details” icon from the right navigation panel.Click to enlarge
- To initiate the translation process, change the workflow stage as defined in the app configuration in step 3 by clicking the Change button.Click to enlarge
- Select the next workflow stage from the Set Workflow Stage dropdown. For instance, after Draft, select the Send for Translation stage to create a project and initiate the translation.Click to enlarge
- You can also set a due date, assign to users or roles, add comments, and then click the Update button.Click to enlarge
Note If you want to use the JSON Rich Text Editor field, you can select the XTM pre-configured JSON RTE template option from the Filter Template drop-down. To configure the Filter Templates in your XTM account, please contact XTM support.
To use the XTM app as an Entry Sidebar, log in to your Contentstack account and follow the steps given below:
- Navigate to Entries from the header and open the entry you want to translate. Then click the “Apps” icon from the right navigation panel.Click to enlarge
- Select XTM from the dropdown and fill in all the fields under the Translate tab.
- Project Name: Enter the project name to create a project for translation.
- Select the Language or Template option:
- Language: If you want to use Language, choose the respective radio button. Then select the locales from the Language dropdown, and choose the Filter Template.
If Auto Assign Template is configured under XTM Fields during app configuration in step 3, it will be selected by default in the dropdown. You can also select any template from the dropdown.
Enable the Exclude XTM Workflow toggle button if you want to exclude the XTM Workflow configured under XTM Fields during app configuration in step 3.
Click to enlargeNote If you are using the JSON Rich Text Editor field, select the JSON RTE Filter template option in your XTM account.
- Template: Click the Template option and select a template from the dropdown.Click to enlarge
- Language: If you want to use Language, choose the respective radio button. Then select the locales from the Language dropdown, and choose the Filter Template.
- Due Date (optional): The due date selected in the Sidebar app will be displayed in the Delivery due date field of the General info section for the specified project in XTM.
- Description (optional): The description provided for the project in the Sidebar app will be displayed in the Description field of the General info section for the specified project in XTM.Click to enlarge
- Entry References: You can add referenced entries for translation directly from the sidebar by clicking the Entry References button.Click to enlarge
In the Translate Referenced Entries modal, select the referenced entries and click Save.
Click to enlarge - Manage Fields: Click the Manage Fields button. In the Manage Fields modal, all fields are selected by default. If fields are specified in the Exclusion or Inclusion settings in the configuration, the fields displayed in the Manage Fields modal will reflect those settings.Click to enlarge
Deselect the fields you want to exclude from the translation and click Save.
Click to enlargeNote Manage Fields settings will be saved for only one instance.
- Files to Import: You can import multiple reference files for translation by clicking the Files to Import button.
Note Total size must not exceed 5 MB.
- Translate: Click the Translate button to complete the project creation and start the translation process.Click to enlarge
- You can view the translation status under the Status tab by selecting a project using the Select Project dropdown. This dropdown holds the Project Name of the translation projects.Click to enlarge
You can view the status of your project, and the date and time of update under the Project Status section. Click the vertical ellipses to Cancel or Reanalyze your project.
Click to enlargeNote When you click Cancel, the project deactivates only in the XTM portal. The localized language remains as it is.
In the Language Status section, you can view the status of the individual language you selected. Click the vertical ellipses to use the View Error (in case of errors), Open Entry, or Cancel options.
Click to enlargeNote You can view the translation status of up to 10 recent projects in the XTM dashboard.
- After successful translation, you can view the translated content in the entries.
Using XTM as a Full Page Location App
To use the XTM app in Contentstack, log in to your Contentstack account and follow the steps below:
- Navigate to the stack dashboard, click Apps from the header, and select the XTM app.Click to enlarge
- You can view the XTM app within your CMS.Click to enlarge
Note Bulk Translate lets you choose specific entries from a content type to send for translation, while Content Types Bulk Translate sends all entries of selected content types for translation at once.
- The Bulk Translate feature sends selected entries for translation and tracks them in one place. To translate content using this option, follow the given steps:Click to enlarge
- Select the Content Type for translation.Click to enlarge
- Select entries for translation.Click to enlarge
Note You can translate up to 500 entries (including locale versions) at once.
- After adding the entries, click Show Selected to view all the entries added for translation.Click to enlarge
- To initiate the translation process, click Translate.Click to enlarge
- In the Confirm Translation modal, fill in the details as follows:
- Provide the Project Name for the translation.
- Select the Language or Template option:
- Language: Click the Language option, then select a Language and a Filter Template from the respective dropdowns.
If Auto Assign Template is configured under XTM Fields during app configuration in step 3, it will be selected by default in the dropdown. You can also select any template from the dropdown.
Note If you are using the JSON Rich Text Editor field, select the JSON RTE Filter template option in your XTM account.
- Template: Click the Template option and select a template from the dropdown.
- Language: Click the Language option, then select a Language and a Filter Template from the respective dropdowns.
- Source Language: Select the language from the Source Language dropdown to define the source of translation. By default, the stack's master language is selected. You can change this to any other language configured in your stack.
Note The Source Language dropdown includes all languages available in your stack. Ensure that the selected source language has existing content in the entries before initiating translation.
- Set the date and time in the Due Date (optional) field for the translation process.
Note The Deadline Date format is mm:dd:yyyy, and the time format is hh:mm:ssZZ, where ZZ refers to the time zone.
- Enter the Description (optional) for the XTM translation project.
- Under the Files to Import section, you can import reference files for translation.
Note Total size must not exceed 5 MB.
- Once these details are added, click the Translate button.Click to enlarge
- Select the Content Type for translation.
- The Content Types Bulk Translate option translates all entries across selected content types at once. To translate content using this feature, follow the given steps:Click to enlarge
- You can Create a Project by providing the Project Name for the translation.
- Select Content Types from the dropdown. You can add multiple content types for translation at one go.
- Select the Source Language from the Source Language dropdown. By default, the stack's master language is pre-selected. You can select any other language available in your stack as the source for translation
NoteThe Source Language option allows you to translate content from a non-master language. For example, if your stack's master language is English but you want to translate French entries into Spanish, select French as the source language.
Click to enlarge - Select the Languages or Templates option:
- Language: Choose the respective radio button. Then select the locales from the Language dropdown, and choose the Filter Template.
Note You can add multiple locales for translation at once.
Click to enlarge - Template: Choose the respective radio button and select the template provided in the dropdown.Click to enlarge
- Language: Choose the respective radio button. Then select the locales from the Language dropdown, and choose the Filter Template.
- Enable the Is Content Type Specific toggle to create a separate project for each content type in the XTM dashboard. Each project will be named using the format <Project_Name Content_Type_UID>. When disabled (default), all content types are grouped under a single Project Name as specified.
- Set the date and time in the Due Date (optional) field for the translation process.
Note The Deadline Date format is mm:dd:yyyy, and the time format is hh:mm:ssZZ, where ZZ refers to the time zone.
- Enter the Description (optional) for the XTM translation project.
- Once these details are added, click the Create Project button to initiate the translation.Click to enlarge
- To view the translation status of the entries, click Project Status from the left panel.Click to enlarge
To view the stack-specific project statuses, select the Stack-specific Projects dropdown option.
Click to enlargeNote You can also view the translation status in the XTM project dashboard.
- To view the detailed status, click the vertical ellipses under the corresponding Actions section and click View Details.Click to enlarge
- You can check the elaborated translation status of the entry.Click to enlarge
- Click Audit Log to view all types of logs: Error Logs, XTM Logs, and Contentstack Entry Logs.Click to enlarge
- To edit, click the vertical ellipses under the corresponding Actions section to edit the entry or view its details.Click to enlarge
- Select Open Entry to go to the entry page.
- Select View Details to get the detailed error.Click to enlarge
After successful translation, you can view the translated content in the entries.
- Navigate to Entries from the header and open the entry you want to translate. Then click the “Workflow Details” icon from the right navigation panel.
Use the XTM app for Human Translation
Human translation in XTM allows an individual user to manually translate content. This process is slower than machine translation.
To translate the content manually using the XTM app in Contentstack, log in to your Contentstack account and follow the steps below:
- Navigate to Entries from the header and open the entry you want to translate. Then click the “Apps” icon from the right navigation panel.Click to enlarge
- Select XTM from the dropdown and create a project. Under the Translate tab, select the Language option, provide Project Name, choose Languages from the dropdown, select the Filter Template, and then click Translate.Click to enlarge
- In the entry sidebar, go to the Status tab. You can view your Project Name in the Select Project dropdown. Copy it to the clipboard to use in XTM.Click to enlarge
Note The Project Name is a unique identifier for the entry. It allows users to easily locate the entry in the XTM dashboard for manual translation.
- Navigate to the XTM dashboard to view all projects. Select the project corresponding to your Project Name.Click to enlarge
- In the left navigation panel, click Workflow. Assign different languages to different users to translate the content manually and then click the Start button.Click to enlarge
Note Users must log in with individual credentials. Human and machine translation use separate credentials in XTM.
- Select the project based on the Project Name and manually translate the content. Once completed, the translated content will be saved automatically and appear in Contentstack.
- Navigate to Entries from the header and open the entry you want to translate. Then click the “Apps” icon from the right navigation panel.
Note
- The XTM app does not support Select, Boolean, Date, and Custom fields for content translation.
- Also, XTM does not support the non-localizeable fields.